"Angarsk Petrochemical Company" JSC: Response to the condition monitoring system COMPACS operation on the А-37/3 ЗМ unit
|
|
The COMPACS® system on the А-37/3 unit is operated since 2007. Today, 35 units of dynamic equipment are covered by the system. Due to the COMPACS® system implementation the maintenance personnel can supervise the machinery condition in real-time by means of continuous computer monitoring and automatic diagnostics of its condition.
Therefore, on 29.08.2014 according to the COMPACS® system readings rapid growth of the vibration acceleration parameter on the D-101 unit with “Unacceptable state” threshold crossing the unit’s repair with smoke exhauster bearings replacement was carried out.
Authors: First Deputy Director General - technical director of "Angarsk Petrochemical Company", JSC I.E. Kuzora, Chief mechanical engineer 3M I.S. Chalbyshev,r Shop No. 101 3M Manager S. A. Aktuganov, Mechanic on VC and VD 3M A.G. Zubov / 2014 Download the response
|