THE COMPACS SYSTEM®
REAL-TIME VIBRATION DIAGNOSTICS
OF MACHINERY WITH PROBABILITY CLOSE TO 1
Русский Русский     EnglishEnglish 
Menu
Home
Products
Customers & responses
Personnel training
About company
News
Publications
Contacts
Awards
  • 2018 "For Achievements in Quality"
  • 2018  «100 Best Products of Russia»
  • 2017 Diploma "Power of the XXI Century"
  • 2016 "Russia’s Honoured Engineer"
  • 2016 "Recognition"
  • 2016 "Import Substitution"
  • 2016 "Innovations and Quality"
  • 2015 "Outstanding manager"
  • 2015 "100 best goods of Russia"
  • 2015 "ESQR’s Quality Achievements Awards"
  • 2014 "Best Quality of Rolling Stock and Complex Technical Systems Contest conducted by Russian Railways"
  • 2014 "Highly-efficient  company"
  • 2014 "Reliable supplier"
  • 2014 "Leader of the Industry"
  • 2014 "Accountant of the Year"
Tags Cloud
Follow us
Facebook Twitter LinkedIn YouTube Google+ RSS
Certification
In 2001 the quality management system of DYNAMICS SPC was put through facultative certification. In 2018 it was recertified for compliance with standards ISO 9001:2015. Its results confirmed a high level of goods and services quality management.
Orphus system
Home Customers & responses Responses Lobnya depot: Response to the Comprehensive System for EMU Sections Diagnostics COMPACS-EXPRESS-TR3

Lobnya depot: Response to the Comprehensive System for EMU Sections Diagnostics COMPACS-EXPRESS-TR3

Print

During 1.5 of a year Comprehensive System for EMU Sections Diagnostics COMPACS®-EXPRESS-TR3 is used as the prime tool of quality control in production of EMU current repair of large volume (TR-3).

COMPACS®-EXPRESS-TR3 is designed for quick condition assessment of the most complex and critical EMU equipment: electrical control circuits, power and supplemental circuits, airbrake system, collectors. The system allows carrying out fine-tuning and adjustment of equipment, with minimal labor and energy resources, bringing their parameters to the requirements of safe and trouble-free operation, and also helps to identify hidden defects in the "problem" electrical sections.

42 electrical sections, repaired under the program TR-3, have been diagnosed during the system operation. At first a number of detected defects was significant and reached 11-13 per section, but the systematic repetition of the same defects allowed adjusting the technological cycles of repair and equipment tests in the production areas of these works in such a way that prevents the installation on the train of low-quality units and devices. Today the number of detected malfunctions is significantly reduced and does not exceed 6-7 per electrical section that clearly indicates repair upgrading.

The use of COMPACS®-EXPRESS-TR3 allowed to improve reliability and safe operation of EMU on the Moscow railway.

 

Authors: Head of the depot Lobnya O.Y. Sergeev / 2010

Download the response


Tags: COMPACS-EXPRESS-TR3 electric multiple unit after-repair testing Date: 22.10.2010
Views: 1570
« Prev. Next »